Skip to workspace
BAS Bridge
System explorer

Office building

Floor equipment, shared plant and HVAC/R electrical meters.

Equipment index
Equipment demand
Loading
Accumulated electricity
Loading
Outdoor air
Loading
Active alarms
Loading

Systems by location

Level 1

Level 2

Mechanical services

BACnet network

Loading devices

Compare the operator workstation’s readings across the building. An online object can report a fixed value. A disconnected controller continues operating its local equipment.

ControllerDevice instanceOnline / totalFreshHeldLost
AHU-0111001————
AHU-0211002————
VAV-0112001————
FCU-0113001————
BLR-0121001————
CH-0122001————
RTU-0114001————
EF-0115001————
REF-0131001————

Communication trial

Hold a device’s last readings, or disconnect it to remove the values. Restore updates to reconnect to its current state.

AHU-01.DATLoading

Office operation

A seasonal profile starts on Monday at 06:00. People occupy five zones on weekdays from 07:00 to 18:00. Equipment in Auto follows its schedule and local sequence.

Energy study

Run a copy of the current office, including its overrides and faults. Pause the building to compare schedules from the same starting conditions.

Select a seasonal profile to enable a study.

Air-handler moisture load

The two air handlers mix outdoor and return air. With chilled water flowing, a wet coil spends part of its cooling capacity condensing water. Profile changes take effect on the next equipment step.

AHU-01 sensible cooling
Loading
Latent cooling
Loading
Condensate rate
Loading
Coil leaving humidity
Loading

Open the AHU-01 instrument bench

Building clock Loading

Eight equipment meters contribute to the total. The VAV terminal draws heat from the boiler loop. Electricity has accumulated since 00:00:00 simulation time. Lighting, plug loads and fuel are outside this meter.