Central plant
CH-01 Centrifugal chiller
Chiller, water circuits, and heat rejection
The teaching controller has accepted a request and is preparing separate water circuits.
Current service callCooling comes on for the conference
The plant has a valid cooling request. Trace each prerequisite before expecting compressor proof.
Model scope and assumptions
Interactive teaching plant · simulated values · accelerated sequence · no connection to operating equipment
A single 500-ton illustrative water-cooled centrifugal chiller with an oil-lubricated compressor, variable-speed capacity control, separate chilled-water and condenser-water pumps, and a cooling tower. Oil-free, multistage, economizer and purge arrangements vary by selected machine.
Run or advance the sequence to observe the requested stage. Changing the case retains your operator commands.
Sequence time is accelerated and illustrative; elapsed seconds are not OEM purge, restart, or safety timer settings.
Case briefCooling comes on for the conference
Fictional training call · Convention-center central plant
Customer report“The event staff want confirmation that cooling is coming online before attendees arrive.”
You are observing a normal scheduled startup with the plant operator.
SERVICE EVIDENCE
Prove the boundary before changing parts.
- Two separate water circuits must prove flow
- Oil preparation follows water proof in this example
- Capacity rises after the compressor starts
WORKING RULES
Keep supervisory control and equipment protection separate.
- A BAS enable is a request; the chiller's local controller retains safety and sequence authority.
- Keep command, motor proof, water-flow proof and thermal response as separate evidence.
- Condenser approach = saturated condensing temperature − leaving condenser-water temperature. Evaporator approach here = leaving chilled water − saturated evaporating temperature.
- Cooling tons = 500 × water flow (gpm) × chilled-water delta-T (°F) / 12,000 for the example's water assumptions; fluid properties and measurement quality matter.
- Heat rejected by the condenser includes both evaporator cooling and compressor input. The model closes that illustrative heat balance.
- Oil and purge points are design-dependent. An oil-free or positive-pressure machine requires a different integration design.
- All timeline delays, capacity response and readings are teaching assumptions. Obtain the exact selected unit's points, sequence and operating envelope before field work.
MANUFACTURER RESEARCH
Read the actual equipment literature.
Start/stop dependencies, local safety and capacity states, Appendix A temperature, pressure, hydraulic, input and output point families. Actual exports and options vary.
Trane CVHE / CVHF / CVHG — Installation, Operation and Maintenance ↗Physical arrangement, independent water circuits and flow proofs, vapor-compression cycle, lubrication and local sequence. Older documented revision; exact installed-unit documentation controls.
YORK OptiView — YK Style H / J control center ↗Equipment cutaway screen organization and flow animation based on actual condenser-flow status. Original artwork in this lab.