Boiler operates after occupied demand ends
Boiler · Controls and communications · Intermediate
Customer complaint
The plant continues heating after the scheduled heating request ends. Determine which source still owns the enable command.
Equipment and operating sequence
Illustrative BACnet commandable heat-enable point: schedule logic writes at priority 15 and authorized temporary service commands at priority 8. No domestic-hot-water or freeze-protection demand is active.
Dispatch intake record
These readings were recorded when the complaint was filed. The equipment views show the running training model under the same fault.
- At 19:00, schedule demand changes to OFF, but effective heat enable remains ON.
- The boiler receives the ON request and continues normal temperature control.
- Supply remains near its 140°F target; local status shows no fault.
- The normal schedule program output reads OFF.
Equipment and training references
Case readings are fictional. These resources document the principles used in the work order.
Caleffi idronics 32: Troubleshooting hydronic systems ↗
Sequence-based hydronic diagnosis, target temperature, flow, and heat transport.
Lochinvar Knight Fire Tube Service Manual, Rev G, models 55–399 ↗
Control inputs, outputs, local sequence, and equipment-side diagnosis. Boiler scenarios remain generic authored configurations, not a simulation of this exact model.
Beckhoff BACnet documentation: Command prioritization ↗
Priority arrays, effective present value and relinquishing a command by writing NULL at its priority.
Equipment graphic
Case intake snapshot · Select a component group to inspect its reported values. Symbols identify equipment groups in this case family.
Boiler · case readings
- Schedule demand Command
- Off
- Effective heat enable Command
- On
- Locally received request Feedback
- On
Point list
Read-only intake values. Priority-array tests add documented overrides. A dash means no value was supplied for that column.
| Point name | Description | Present value | Units | Commanded | Feedback | Status | Override |
|---|---|---|---|---|---|---|---|
| Schedule demand | Command · Boiler | Off | — | Off | — | — | — |
| Effective heat enable | Command · Boiler | On | — | On | — | — | — |
| Locally received request | Feedback · Boiler | On | — | — | On | — | — |
| Supply target | Setpoint · Supply header | 140 | °F | — | — | — | — |
Intake observations
- At 19:00, schedule demand changes to OFF, but effective heat enable remains ON.
- The boiler receives the ON request and continues normal temperature control.
- Supply remains near its 140°F target; local status shows no fault.
- The normal schedule program output reads OFF.
Alarm records
Reported condition and event observations. Priority and acknowledgment are shown only when documented.
| Equipment | Alarm / event description | Record source | Priority | Timestamp | Acknowledgment |
|---|---|---|---|---|---|
| Boiler | Supply remains near its 140°F target; local status shows no fault. | Intake record | Unreported | Unreported | Unreported |
Trend and history records
Recorded comparisons, event timing and time-series observations from this work order.
| Equipment | Recorded trend evidence | Record source |
|---|---|---|
| Boiler | At 19:00, schedule demand changes to OFF, but effective heat enable remains ON. | Intake record |