Field assignment
Identify the equipment serving the office, inspect the request and proof, then select the two meter readings that distinguish a circuit interruption from a failed load. Record the diagnosis, correction, and measured recovery in the dispatch.
Open assessed work order · AHU-11
Required evidence includes the coil voltage during demand, isolated winding resistance, authorized repair and a sustained airflow retest. Your verified dispatch returns here.
Practical outstanding · Knowledge outstanding
Independent transfer assessment
Pass at 80%. Every safety item must also pass.