Compare enabling conditions, stages of operation and independent feedback with the project’s approved sequence.

Illustrative operating sequences

Illustrative operating sequences
EquipmentWhat to trace
Occupied AHUSchedule or override requests occupancy. With required permissives, request fan start. Verify independent proof within the expected interval. Enable normal loops and ventilation according to the approved sequence.
VAV terminal with reheatDetermine zone mode and active airflow target. The damper loop controls measured flow. At heating demand the sequence can enable reheat subject to minimum flow and configured limits.
Outdoor-air economizerVerify available outdoor-air cooling, ventilation minimum and mixed-air limits. Compare damper command with blade position and mixed-air temperature at useful load.
Chilled-water plantDemand initiates the plant. Required water paths and pumps establish flow. Chiller receives enable subject to local permissives and timing. Compare flow, compressor operation and water temperatures.
Heating-water plantDemand selects lead equipment and active supply target. Prove the applicable water flow and local ready state. Observe heat delivery before adding capacity under the staging rules.

Field example

At a cooling VAV, airflow is below its active setpoint, damper demand is high and the actuator is fully open. Inspect upstream static and restrictions before changing zone proportional gain.