Skip to workspace
BAS Bridge
System explorer
Work order BL-06

Plant capacity disappears after a lead-boiler outage

Boiler · Sequences of operation · Intermediate

← Service dispatch
Isolated case simulation0/2 tests recordedInvestigation openDraft autosaves in this browser

Customer complaint

The lead boiler is unavailable, but the healthy lag boiler does not take over. Trace the supervisory staging decision.

Equipment and operating sequence

Illustrative two-boiler plant: an available lag boiler must be enabled after a 120-second unmet-demand delay when the lead is unavailable. Each boiler controls its own safety sequence.

Dispatch intake record

These readings were recorded when the complaint was filed. The equipment views show the running training model under the same fault.

  • Supply is 112°F against a 150°F target for 10 minutes.
  • Lead boiler is locked out and correctly excluded from staging.
  • Lag local display reads Remote Ready; local alarm is clear.
  • BMS lists lag Available = FALSE and sends no enable request.
Equipment and training references

Case readings are fictional. These resources document the principles used in the work order.

Caleffi idronics 32: Troubleshooting hydronic systems ↗
Sequence-based hydronic diagnosis, target temperature, flow, and heat transport.

Lochinvar Knight Fire Tube Service Manual, Rev G, models 55–399 ↗
Control inputs, outputs, local sequence, and equipment-side diagnosis. Boiler scenarios remain generic authored configurations, not a simulation of this exact model.

Equipment graphic

Case intake snapshot · Select a component group to inspect its reported values. Symbols identify equipment groups in this case family.

Supply header · case readings

System supply Reading
112 °F
Supply target Setpoint
150 °F

Point list

Read-only intake values. Priority-array tests add documented overrides. A dash means no value was supplied for that column.

Point nameDescriptionPresent valueUnitsCommandedFeedbackStatusOverride
System supplyReading · Supply header112°F————
Supply targetSetpoint · Supply header150°F————
Lead boilerStatus · BoilerLocked out———Locked out—
Lag local displayStatus · BoilerRemote ready———Remote ready—

Intake observations

  • Supply is 112°F against a 150°F target for 10 minutes.
  • Lead boiler is locked out and correctly excluded from staging.
  • Lag local display reads Remote Ready; local alarm is clear.
  • BMS lists lag Available = FALSE and sends no enable request.

Alarm records

Reported condition and event observations. Priority and acknowledgment are shown only when documented.

EquipmentAlarm / event descriptionRecord sourcePriorityTimestampAcknowledgment
BoilerLead boiler is locked out and correctly excluded from staging.Intake recordUnreportedUnreportedUnreported
BoilerLag local display reads Remote Ready; local alarm is clear.Intake recordUnreportedUnreportedUnreported

Trend and history records

Recorded comparisons, event timing and time-series observations from this work order.

No historical series or trend observation is included in the evidence collected so far.

Field mentor