Plant capacity disappears after a lead-boiler outage
Boiler · Sequences of operation · Intermediate
Customer complaint
The lead boiler is unavailable, but the healthy lag boiler does not take over. Trace the supervisory staging decision.
Equipment and operating sequence
Illustrative two-boiler plant: an available lag boiler must be enabled after a 120-second unmet-demand delay when the lead is unavailable. Each boiler controls its own safety sequence.
Dispatch intake record
These readings were recorded when the complaint was filed. The equipment views show the running training model under the same fault.
- Supply is 112°F against a 150°F target for 10 minutes.
- Lead boiler is locked out and correctly excluded from staging.
- Lag local display reads Remote Ready; local alarm is clear.
- BMS lists lag Available = FALSE and sends no enable request.
Equipment and training references
Case readings are fictional. These resources document the principles used in the work order.
Caleffi idronics 32: Troubleshooting hydronic systems ↗
Sequence-based hydronic diagnosis, target temperature, flow, and heat transport.
Lochinvar Knight Fire Tube Service Manual, Rev G, models 55–399 ↗
Control inputs, outputs, local sequence, and equipment-side diagnosis. Boiler scenarios remain generic authored configurations, not a simulation of this exact model.
Equipment graphic
Case intake snapshot · Select a component group to inspect its reported values. Symbols identify equipment groups in this case family.
Supply header · case readings
- System supply Reading
- 112 °F
- Supply target Setpoint
- 150 °F
Point list
Read-only intake values. Priority-array tests add documented overrides. A dash means no value was supplied for that column.
| Point name | Description | Present value | Units | Commanded | Feedback | Status | Override |
|---|---|---|---|---|---|---|---|
| System supply | Reading · Supply header | 112 | °F | — | — | — | — |
| Supply target | Setpoint · Supply header | 150 | °F | — | — | — | — |
| Lead boiler | Status · Boiler | Locked out | — | — | — | Locked out | — |
| Lag local display | Status · Boiler | Remote ready | — | — | — | Remote ready | — |
Intake observations
- Supply is 112°F against a 150°F target for 10 minutes.
- Lead boiler is locked out and correctly excluded from staging.
- Lag local display reads Remote Ready; local alarm is clear.
- BMS lists lag Available = FALSE and sends no enable request.
Alarm records
Reported condition and event observations. Priority and acknowledgment are shown only when documented.
| Equipment | Alarm / event description | Record source | Priority | Timestamp | Acknowledgment |
|---|---|---|---|---|---|
| Boiler | Lead boiler is locked out and correctly excluded from staging. | Intake record | Unreported | Unreported | Unreported |
| Boiler | Lag local display reads Remote Ready; local alarm is clear. | Intake record | Unreported | Unreported | Unreported |
Trend and history records
Recorded comparisons, event timing and time-series observations from this work order.
No historical series or trend observation is included in the evidence collected so far.