Work order BL-09

Hot boiler outlet but cooler distribution supply

Boiler · Hydronic systems · Advanced

← Service dispatch
Isolated case simulation0/2 tests recordedInvestigation openDraft autosaves in this browser

Customer complaint

A separated plant has adequate boiler temperature but poor building delivery. Use flow and temperature evidence to locate the problem.

Equipment and operating sequence

Illustrative water-only primary/secondary plant with a hydraulic separator. Approved primary and secondary flows are both 60 gpm at this load; distribution requires 180°F supply. Recovery assumes sufficient boiler capacity: 60 gpm heated from 140°F to 180°F requires about 1,200,000 Btu/h of delivered heat. “Same load” here means unchanged building demand. These case readings are separate from the operating lab model.

Dispatch intake record

These readings were recorded when the complaint was filed. The equipment views show the running training model under the same fault.

  • Boiler outlet is 180°F; system return is 140°F.
  • Primary flow is 30 gpm and secondary flow is 60 gpm.
  • System supply is 160°F, with return water mixing upward through the separator.
  • Primary pump runs at 30 Hz; its automatic request is 60 Hz.
Equipment and training references

Case readings are fictional. These resources document the principles used in the work order.

Caleffi idronics 32: Troubleshooting hydronic systems ↗
Sequence-based hydronic diagnosis, target temperature, flow, and heat transport.

Lochinvar Knight Fire Tube Service Manual, Rev G, models 55–399 ↗
Control inputs, outputs, local sequence, and equipment-side diagnosis. Boiler scenarios remain generic authored configurations, not a simulation of this exact model.

Equipment graphic

Case intake snapshot · Select a component group to inspect its reported values. Symbols identify equipment groups in this case family.

Boiler · case readings

Boiler outlet Reading
180 °F

Point list

Read-only intake values. Priority-array tests add documented overrides. A dash means no value was supplied for that column.

Point nameDescriptionPresent valueUnitsCommandedFeedbackStatusOverride
Boiler outletReading · Boiler180°F————
Distribution supplyReading · Supply header160°F————
Primary flowReading · Circulation30gpm————
Secondary flowReading · Distribution60gpm————
Primary pump requestCommand · Circulation60Hz60———
Primary pump runningFeedback · Circulation30Hz—30——

Intake observations

  • Boiler outlet is 180°F; system return is 140°F.
  • Primary flow is 30 gpm and secondary flow is 60 gpm.
  • System supply is 160°F, with return water mixing upward through the separator.
  • Primary pump runs at 30 Hz; its automatic request is 60 Hz.

Alarm records

Reported condition and event observations. Priority and acknowledgment are shown only when documented.

No alarm observation is included in the evidence collected so far.

Trend and history records

Recorded comparisons, event timing and time-series observations from this work order.

No historical series or trend observation is included in the evidence collected so far.