Cooling requested, startup remains on hold
Chiller · Electrical · Foundation
Customer complaint
An occupied building needs cooling, but the chiller never leaves its flow-verification step. Find the missing response without bypassing the start sequence.
Equipment and operating sequence
Illustrative dedicated-pump plant. Compressor enable requires verified evaporator flow after a 30-second pump-proving interval; the interval has expired.
Dispatch intake record
These readings were recorded when the complaint was filed. The equipment views show the running training model under the same fault.
- 14:00: CHW pump command ON; independent run feedback OFF.
- Evaporator flow 0 gpm; flow permissive FALSE.
- Cooling request TRUE; chiller available TRUE; leaving water 59°F.
Equipment and training references
Case readings are fictional. These resources document the principles used in the work order.
Trane: Chilled-Water Systems, TRG-TRC016-EN ↗
Chilled-water and condenser-water circuits, load, bypass flow, and plant control relationships.
Equipment graphic
Case intake snapshot · Select a component group to inspect its reported values. Symbols identify equipment groups in this case family.
CHW distribution · case readings
- CHW pump start Command
- On
- Pump run Feedback
- Off
Point list
Read-only intake values. Priority-array tests add documented overrides. A dash means no value was supplied for that column.
| Point name | Description | Present value | Units | Commanded | Feedback | Status | Override |
|---|---|---|---|---|---|---|---|
| CHW pump start | Command · CHW distribution | On | — | On | — | — | — |
| Pump run | Feedback · CHW distribution | Off | — | — | Off | — | — |
| Evaporator flow | Reading · Evaporator | 0 | gpm | — | — | — | — |
| Leaving chilled water | Reading · Evaporator | 59 | °F | — | — | — | — |
Intake observations
- 14:00: CHW pump command ON; independent run feedback OFF.
- Evaporator flow 0 gpm; flow permissive FALSE.
- Cooling request TRUE; chiller available TRUE; leaving water 59°F.
Alarm records
Reported condition and event observations. Priority and acknowledgment are shown only when documented.
No alarm observation is included in the evidence collected so far.
Trend and history records
Recorded comparisons, event timing and time-series observations from this work order.
No historical series or trend observation is included in the evidence collected so far.