Work order CH-07

Lead machine is fully loaded but standby stays idle

Chiller · Sequences of operation · Intermediate

← Service dispatch
Isolated case simulation0/2 tests recordedInvestigation openDraft autosaves in this browser

Customer complaint

The lead chiller cannot meet the sustained load, yet the available standby unit does not receive a start request. Find the blocked staging step.

Equipment and operating sequence

Two illustrative 250-ton chillers. Approved sequence stages the second after load exceeds 230 tons and CHWS exceeds 46°F continuously for five minutes; all other staging conditions are satisfied.

Dispatch intake record

These readings were recorded when the complaint was filed. The equipment views show the running training model under the same fault.

  • 16:20: lead at 100% capacity; measured building load approximately 300 tons.
  • CHWS 49°F against 44°F target; staging conditions TRUE for 12 minutes.
  • Standby available TRUE; start command OFF; stage-up timer still timing.
Equipment and training references

Case readings are fictional. These resources document the principles used in the work order.

Trane: Chilled-Water Systems, TRG-TRC016-EN ↗
Chilled-water and condenser-water circuits, load, bypass flow, and plant control relationships.

Equipment graphic

Case intake snapshot · Select a component group to inspect its reported values. Symbols identify equipment groups in this case family.

Compressor · case readings

Lead capacity Reading
100 %
Building load Reading
≈300 tons
Standby start Command
Off

Point list

Read-only intake values. Priority-array tests add documented overrides. A dash means no value was supplied for that column.

Point nameDescriptionPresent valueUnitsCommandedFeedbackStatusOverride
Lead capacityReading · Compressor100%————
Building loadReading · Compressor≈300tons————
CHWSReading · Evaporator49°F————
Standby startCommand · CompressorOff—Off———

Intake observations

  • 16:20: lead at 100% capacity; measured building load approximately 300 tons.
  • CHWS 49°F against 44°F target; staging conditions TRUE for 12 minutes.
  • Standby available TRUE; start command OFF; stage-up timer still timing.

Alarm records

Reported condition and event observations. Priority and acknowledgment are shown only when documented.

No alarm observation is included in the evidence collected so far.

Trend and history records

Recorded comparisons, event timing and time-series observations from this work order.

EquipmentRecorded trend evidenceRecord source
ChillerCHWS 49°F against 44°F target; staging conditions TRUE for 12 minutes.Intake record