What you’ll learn

  • Distinguish insufficient flow from an unsuitable water temperature.
  • Evaluate equipment rotation, staging and total plant energy.
  • Calculate the cooling load from flow and paired temperatures and interpret a low delta-T at comparable load.
Before you start · 2 related lessons0 of 2 prerequisites demonstrated. You can open this lesson at any time.

Pressure and water temperature act through different mechanisms

A pump differential pressure (DP) reset changes available head across the distribution network. A chilled-water supply reset changes the thermal driving force and the coil's ability to remove moisture. Hot-water reset typically reduces supply temperature during lighter heating loads. Confirm the boiler type, minimum allowable temperatures and plant arrangement. Controls suitable for condensing boilers can be inappropriate for an unprotected noncondensing boiler.

Follow the critical branch

A fully open cooling valve at a starved coil can reflect low branch flow, warm chilled water, fouling or insufficient coil airflow. Compare actual water temperatures and flow at that branch before adjusting plant targets. A healthy remote coil that needs high DP under design load can constrain the reset even when the mechanical-room pressure is high. Place the pressure observation at the location the design sequence actually controls.

Locate the two pumping arrangements

In a primary-secondary chilled-water plant, the primary pumps circulate through operating evaporators. Secondary pumps serve the distribution piping. A low-resistance common pipe, also called a decoupler, accommodates the difference between the two flow rates. If primary flow exceeds building flow, some cold supply returns through the common pipe. If building flow exceeds primary flow, some return water mixes into the distribution supply. Identify both directions on the installed drawing and locate the temperature sensors relative to that connection.

Protect each operating evaporator

In a variable-primary-flow plant the same pumping system moves water through the active chillers and the distribution loads. As two-way coil valves close, total flow can fall. Check each active chiller’s permitted flow range and rate of change in its own submittal. A designed minimum-flow bypass may open to maintain evaporator flow at low demand. Record branch and bypass flow, the number of active machines, pump response and any restrictions before adjusting pressure or staging. A closed flow switch can satisfy a while leaving the actual margin above minimum unknown.

Work a low delta-T comparison

At the same distribution header under steady cooling, matched sensors and a verified flow meter record 44°F supply, 56°F return and 200 U.S. gpm. Later the same header reads 44°F supply, 50°F return and 400 gpm. For plain liquid water at these temperatures, approximate cooling in Btu/h as 500 × gpm × (return °F − supply °F). The first period gives 500 × 200 × 12 = 1,200,000 Btu/h. The second gives 500 × 400 × 6 = 1,200,000 Btu/h. Both deliver about 100 refrigeration tons at 12,000 Btu/h per ton. A glycol mixture needs its own density and heat capacity.

The second period carries the same measured cooling with twice the flow. Compare pump kW before claiming added energy cost. To investigate a persistent low temperature difference (low delta-T), check paired sensor accuracy and placement, then separate coil flow and temperature rise from bypass or mixing flow. A leaking valve, an overfed coil or low coil airflow can each reduce return-water warming. A lightly loaded building can also have a small difference. Compare equivalent loads and actual occupied-zone service before making a change, and preserve the evaporator minimum throughout.

Coordinate stage and reset timing

Lead–lag rotation shares wear or runtime among available machines. Capacity staging adds or sheds equipment when demand and limits persist. Hold or slow a reset during a stage transition where the approved sequence requires it, then evaluate recovery after the new stage has established flow. Compare combined pump, chiller and tower power per unit of delivered cooling at similar weather and load.

Resolve a high plant demand request
  1. Coil requests more capacity
  2. Check branch water flow and temperatures
  3. Adjust bounded DP or water target as specified
  4. Apply stage timing and available equipment rules
  5. Measure delivered load and total power

Normal operation

Example training conditions

  • At the occupied heating load the lead pump has proof and the supply header is 142°F against a 142°F target. The lag stage remains available while the lead satisfies the load.
  • After a scheduled rotation, verify the new lead's physical operation and header recovery under comparable demand.

Worked service example

A plant operator expects energy savings after raising chilled-water temperature.

Recorded field evidence · training example

  • At comparable 100-ton load, chiller drops from 74 to 69 kW
  • Distribution pump rises from 8 to 15 kW
  • Tower and other auxiliaries unchanged

Combined chiller and pump power increases from 82 to 84 kW, or from 0.82 to 0.84 kW/ton for the measured pair. Include all auxiliaries in the plant boundary before making a whole-plant claim.

Field procedure

  1. Compare the most demanding coil with a satisfied branch under the same plant conditions.
  2. Check active limits, lead availability, flow proof and minimum run times.
  3. Compare delivered heating or cooling and total energy using equivalent time windows.

Hands-on exercise

Choose signals and a time window that separate a stage transition from sustained unmet load.

Watch the lag chiller take the load

The lead chiller is at its capacity limit. Lag start was requested at minute 2. The accepted recovery test is supply water within 1°F of its 44°F setpoint by minute 10.

Chilled-water supply · °F
44490 min10 min
Common supply target · °F
44450 min10 min
0 min · Chilled-water supply 46 °F · Common supply target 44 °F

Plot actual supply temperature and lag run proof. Record when lag operation is first sampled and the end of the recovery window.

Unit 7 service call

The supply header is hot, but the perimeter is cold.

Compare the header, healthy branch and affected coil under the same load. Bring back the source, reading and time of your strongest observation.

Open case simulator

Knowledge check

Pass at 80%.

1. At a steady 120 tons, measured total plant input is 96 kW. What is the observed plant efficiency?
2. The duty pump is scheduled to rotate to its standby mate, but the standby drive reports a fault. Which outcome should be evaluated in the approved test?
3. During a steady test, chillers draw 52 kW, pumps 9 kW and the tower fan 5 kW while the plant supplies 100 tons. What total plant kW per ton should be reported?
4. Three chillers are available. One staging change would take an operating evaporator below its documented minimum flow. Which constraint governs the trial?
5. Several coils meet their targets. One is fully open with very low measured branch flow while plant supply temperature is correct. Which evidence comes next?

Field takeaways

  • Separate flow limits from temperature limits at the critical load.
  • Optimize measured plant energy at comparable load, including auxiliaries.

References and further reading