What you’ll learn
- Trace condenser water through a tower.
- Calculate cooling range and compare outlet temperature with outdoor wet-bulb.
Before you start · 2 related lessons
0 of 2 prerequisites demonstrated. You can open this lesson at any time.What the equipment does
A cooling tower transfers heat from warm condenser water to outdoor air. In an evaporative tower a small fraction of the water evaporates. Air flows over wetted surfaces called fill, and cooler water collects in a basin. A fan can increase airflow through the tower.
Follow the physical path
Trace heated water from the chiller condenser to the tower inlet, across the fill and back toward the condenser. Outdoor Temperature associated with evaporative cooling of a wetted sensor exposed to airflow. temperature describes the cooling effect available through evaporation. The cold-water outlet normally stays above the entering-air wet-bulb under useful load. Range is hot inlet minus cold outlet. Tower cold-water temperature minus the entering-air wet-bulb temperature. is cold outlet minus entering-air wet-bulb.
Condenser-water circuit
Tower air · induced-draft example
Warm return · Water brings heat from the chiller condenser to the top of this example tower.
Normal operation
Example training conditions
- Hot condenser water reaches the tower at 92°F and returns to the chiller at 82°F. Range is 10°F.
- At 75°F entering-air wet-bulb, approach is 7°F. Weather, load, flow and tower condition affect these values.
Worked service example
Leaving tower water is 4°F warmer than yesterday.
Recorded field evidence · training example
- Yesterday 77°F cold water with 70°F entering wet-bulb.
- Today 81°F cold water with 74°F entering wet-bulb.
- Condenser load and flow have not yet been compared.
Approach was 7°F on both days. The weather change can account for the warmer supply, but a capacity comparison also needs load and flow. Check both before changing the tower control.
Terms in this lesson
- Wet-bulb
- Temperature associated with evaporative cooling of a wetted sensor exposed to airflow.
- Approach
- Tower cold-water temperature minus the entering-air wet-bulb temperature.
Hands-on exercise
Check a proposed cold-water target on a humid afternoon.
Predict before inspection
Standalone simulator · free practice
Locate CH-01 tower controls
Identify tower command separately from chilled-water pump and compressor operation.
Open simulator →Knowledge check
Pass at 80%.
Field takeaways
- Record hot water, cold water, entering wet-bulb and load together.